News

Methods for Dealing with Transformer Failures

The guidelines for handling transformer tripping state that when a transformer trips, the on-site procedures should be followed to stop and check, analyze the maintenance actions and the phenomena at the time of the incident, determine the accident status, and take appropriate measures. If both gas protection and differential protection trip simultaneously, do not restore power until the cause is clarified and the issue is resolved. When the differential protection of the transformer trips, an inspection of the external parts of the main transformer should be conducted, and relevant personnel from the work area, maintenance, and relay departments should be notified to rush to the site. The primary and secondary circuits of the transformer should be inspected, and the oil and gas properties of the transformer should be measured. After conducting tests such as DC resistance and insulation to confirm that there are no issues with the transformer and its protection control circuits, a strong power restoration can be attempted once. In urgent system situations, after checking the external parts of the main transformer and finding no abnormalities in the insulation tests, a trial power restoration can be conducted with the approval of the chief engineer. After the gas protection action has tripped, a trial power restoration can only be attempted if it is confirmed that the gas protection acted incorrectly or that there are no issues inside the transformer. When the transformer overcurrent protection trips, an inspection and analysis of the transformer and its load conditions, as well as the status of the outgoing line protection actions, should be conducted. If the trip is due to a transient issue, inspection may not be necessary. After disconnecting the problematic outgoing line switch, power can be restored to the transformer, and the non-problematic outgoing lines should be restored one by one, with the work area notified for testing and inspection.


How to maintain a transformer?

The maintenance of transformers is to ensure the normal and safe operation of the transformer after inspection. Power safety and stability require that transformers, whether in operation or out of service, be maintained once a year. Transformers that are about to be put into operation should be checked and maintained beforehand. Firstly, regular cleaning of the transformer is necessary. Since transformers need to dissipate heat during operation, excessive dust, leaves, and other impurities on the transformer can not only affect its heat dissipation performance but also lead to reduced insulation properties or even insulation breakdown due to poor heat dissipation, directly causing transformer failures and potentially severely affecting the lifespan of the transformer. Therefore, in practice, the transformer should be cleaned at least once a year, removing impurities from the surface and using a vacuum cleaner to eliminate dust from the inside. Secondly, the ventilation equipment of the transformer also requires regular maintenance and cleaning. The fan of the transformer plays an important role in cooling and heat dissipation. If the fan stops running, the transformer may experience poor heat dissipation, leading to failures or even fire hazards. Therefore, the fan should be cleaned regularly, just like the transformer itself. Finally, it is necessary to regularly check whether the firmware and connectors of the transformer are loose and whether there is extensive rusting. During the operation of the transformer, it is inevitable that fasteners may become loose, so regular checks are needed, and any damaged parts should be replaced promptly. Additionally, if the transformer shows extensive rusting, it will increase energy consumption and reduce power output, so regular inspections should be conducted, and measures should be taken to prevent rusting of the core.


< 1234 > proceed page